The Great Wall continues.... Tier 2

Thankfully, the upper tier is proving easier to dig than the lower, due to not having to dig through the hardpan. Still, A long way to go.....

Monday, January 6, 2014

In which it takes 12 hours to change out a toilet.....

Take it from one who has learned her lesson. 7pm on a sunday night is NOT the time to decide to tackle the removal and replacement of the ONLY TOILET IN THE HOUSE.

Old Nasty
SO, the tiny batcave bathroom came with what looks like a REALLY old toilet complete with microbes and bacteria that look to have been thriving for the last 40 years or so. I have avoided looking too closely or tampering with it in any way (aside from dumping numerous bleach and cleaner products within) because, well, it's a toilet.  But since I have a bit of free time on my hands this week, I've been compiling a list of "need to do" projects that are inexpensive. Swapping out the old toilet is inexpensive because I've been intending to put the larger, higher toilet from the master bath in its place. And so. Last night I had an impulse to just do it.

Which led to the discovery that my water main does NOT shut off all the way. I thought it was just the water in the pipes that needed to be bled off, so I started dismantling the old toilet. 15 minutes later, with the tank already thrown in the trash and the shutoff valve at the tank completely frozen, I realized my error. 10 minutes too late. The tank cracked when I chucked it in the trash. So now it's 8pm and I figure I'll just keep a bucket under the valve until I can do a quick swap of the toilet bases. Except the old toilet has FOUR bolts. And 2 are so rusted they do not want to budge an inch. I use a penetrant and keep dinking away at them (emptying the 5 gallon bucket of overflow water every 45 minutes). And then, magic, the old toilet gives up the ghost and comes off. I rejoice. I scrape all the old wax off the flange and install a new waxless ring on the new toilet.

Water off, dismantling begins.
And then. I can't get the waxless ring to allow the toilet to sit flush on the tile. Without the ring, it sat perfectly. With the ring, it sits about a half inch high and my body weight is not enough to force the waxless ring all the way down. And then I realize my goof.  While perusing the various toilet replacement reccommendations on the internets, somehow none of them mentioned that instead of just scraping off the old wax, you also have to REMOVE the reinforcement ring that the old wax ring sat upon. It came out. On the end of the waxless seal, which I also managed to tear. So now I have to way to seal the toilet until lowes opens at 6am. NICE.  and my water main is dripping at the rate of One 5-gallon bucket per hour.  I cover the sewer hole, empty the bucket and set my alarm for an hour.  And I repeat all night until all curses have been used and my eyeballs feel like sandpaper.

new wax ring. and new bolts.
The old wax ring, and steadily leaking water valve
At 6am I go get a WAX ring and come home to install it flawlessly. SCORE!  and then I realise that the old toilet was small. The new toilet is larger and taller. Thus the 12 inch connector line from the toilet to the water line is now about 1 inch short. Fuck.  Empty bucket and run back to Lowes. Lowes does not have a 1/2 to 7/8 line in any length greater than 12 inches. Fuck. Debate running home to empty bucket. Run to OSH instead. Victory. They have the line and I am racing home to beat the bucket deadline. At this point it is neccessity. I've been holding it for 12 hours. I need to go.



 I make it home in time to empty the bucket and tighten up the new toilet installation. Then I risk turning the water main back on. The new low-flow toilet fills, it holds water, it flushes beautifully and finally, relief.  and I do mean RELIEF.

Who knew toilets were so simple parts wise, but such a pain in the arse to dial in?  Next time, I will be better prepared.


Wednesday, January 1, 2014

The Great Wall of Fresno

The time has come to tackle my eroding slope at the back of the canal bank. Since the rear of my property backs onto a large canal bank, there is roughly a 6 foot difference between the flat of my backyard and the shoulder of the canal bank. And so, a tier system must be built to contain the erosion. Oh how I love to dig post holes in hardpan.....
Still to be excavated...
 
The first section of posts
Lets hope I can finish it in time for spring planting......

Wednesday, June 12, 2013

Courtyard drainage.....

So half my front yard is absolutely gorgeous. Low water, no mowing, minimal weeding and blooming away like a champ. The OTHER half has been, well........ bleh.


Granted, the torn up driveway doesn't help, but my biggest issue has been trying to solve a drainage issue stemming from the first incompetent contractor who worked on the courtyard and poured the slab 4 inches lower than planned. Thus, the drainage for the courtyard is a little outlet that was just below level with the yard. doh.

SO. The long stretch of wall visible above at the right side presented some issues. How to incorporate drainage without it looking like a giant drainage ditch. oh good,  a puzzle.


First we re-route some of the courtyard plumbing....
Then we start building concrete molds for curbing.....


The general idea was to try and make the drainage look like a dry desert wash or creek bed to fit in with my general garden theme from the other side of the yard. How it turns out.... still unknown.

I did discover that it is not easy for one person to do concrete work solo. I mixed the first section myself... pressed some river rock into the top as it set....
 
and then I wised up and asked my neighbors for help with the second and third sections....  This allowed me to finish the back curb and start planting some succulents in the dirt strip along the courtyard wall. To soften the edge and because I like succulents. alot.


I still have one more section of curb to pour and then gravel and cobble to place. Should be able to finish it up by the weekend.

Top of the drainage. Run-off from the courtyard comes out a small hole at the top right of the gravel section.



Tuesday, April 16, 2013

Lunch hour coop work

Had an hour (okay, two) today to do a little more work on the coop.....
Installing hardibacker over the plywood floor.

BOTH sides of the roof base on

TCI: Tiny Chicken Inspection Committee wants to see your permits!

Tiny Chicken Inspection Crew naps on their lunch break.


Sunday, April 14, 2013

And the Coop played on.....

I want a mulligan on this weekend. Yes, I got a lot done, but not nearly as much as I'd fantasized about. Thanks to my "Big Sis" and the circle drive roofing crew who were sooooo nice in helping give the coop progress a boost right when my "can do" was about to poop out completely. You guys are the best. Progress Report!
The trap door to chicken guantanamo
Big Sis leveling out the pad for the chicken ladder


The Roofing Crew
The patio and finishing the jail

Front siding on! Sis is installing her million hour door.
Nest Boxes nearly done, roof half on

And the little runts get one more week of being house chickens. dammit.


The roof and finishing the siding install are next!!. doh.

Saturday, April 13, 2013

Progress, slow and steady.....

Didn't get as far as I'd hoped, but progress is progress and I'll take what I can get....

Chicken Guantanamo is now fenced in and brick floor is in place...
backside fencing

three sides done

Half brick floor in
Brick floor in, patio step dug out

Floor in, Sand in, fenced, just needs a door.....